Experience Sharing: Key Points, Difficulties and Treatment Measures of Integrated Wiring Construction

2023-07-28 09:40 Author:surlink


Key Points, Difficulties and Treatment Measures of Construction

 

For the wiring system, the difficulty of construction mainly lies in how to solve the problem of the installation and positioning of the information socket.

 

Generally speaking, the installation of information outlets can be roughly divided into three types:

 

wall embedded installation

 

Embedded installation on the wall is the most common installation method, using the 86-type bottom box (concealed in the wall), and the lower edge of the bottom box is 300mm from the ground after decoration.

 

ground socket installation

 

In some large conference rooms and leadership offices, some information points must be installed in the room away from the wall. At this time, for the convenience of use, it is recommended to use the installation method of the ground socket. However, due to the high cost of the floor box, this installation method is difficult to promote in a large area in actual installation. In addition, the characteristics of concrete with a large market should be fully considered in the installation of floor inserts, and the installation depth should avoid damage to the concrete anti-corrosion layer and affect the quality of the concrete.

 

Install directly on office furniture

 

This method is mainly aimed at the currently popular cost-effective solutions used in large-bay offices and other places, and mainly adopts two construction solutions:

 

The first one is that for the parts where the information points are densely distributed, it is recommended to adopt the floor trench laying scheme during construction (this kind of scheme is mainly suitable for office spaces where the ground is covered with assembleable carpets). Because most of the components (including floor inserts, floor troughs and wire pipes, etc.) used in this scheme are mainly hidden in the leveling layer of the floor, the overall cost may be high and the construction is difficult. However, because it is not possible to predict the specific office location of the staff in advance, it has good flexibility and is not affected by the change of the office location of the staff. Therefore, some large-bay office spaces, halls and workshops are now more and more widely used.

 

The second type, for the parts where the distribution of information points is not very dense, the pipeline laying can start from the horizontal bridge laid in the ceiling during construction, and pass through the line pipe (the line pipe is buried along the wall, column surface and floor screed) To the installation place of the information socket, and the information socket can be directly installed on the office furniture. In this way, the increased cost due to the use of the floor trough scheme can be reduced, and the overall input cost of the system can be reduced. The disadvantage of this method is that it must be closely coordinated with the later decoration plan, and the flexibility is less.

 

Therefore, other installation methods can be found for the installation of the information socket, which will not be listed here; the owner can find a better one under the premise of ensuring the performance of the system according to his actual usage and possible office function requirements. solution to improve the performance-price ratio of the system.

 


icon-a11,icon-a12

communicate

Tel:+86 (0574)4008884068

Email:sales@sur-link.com

icon-a21,icon-a22,

Inventory

Log in
Email      
Password
Sign up
Register
Company
Email      
Phone     
Password